Featured projects

Horizontal directional drilling rig set up on site, ready to bore a road crossing

Golden Highway signal-crossing project

Golden Highway — Grasmere to Southgate

A large-scale trenchless installation along the Golden Highway, boring at 13 separate intersections to install new ducting around each crossing and out to the central islands for new traffic signals. Every intersection was bored to carry 1×160mm and 2×110mm HDPE pipe.

13intersections
1,400mtotal bored
1,605m160mm HDPE installed
2,990m110mm HDPE installed

No two intersections shared the same ground conditions, so each crossing needed a fresh plan and approach. Boring had to be fast and accurate around a dense network of live existing services — fibre, power, water, gas and stormwater — and the full scope across all 13 intersections was completed within a two-month deadline to keep the project on schedule.

More from site

Cable ducts entering a bore pit Bore exit pit — cable ducts
Pipe installed in a narrow trench HDPE pipe & sleeve
Trench with HDPE pipe ready for pullback Bore entry pit — pull-back
Butt welding clamp fusing HDPE pipe HDPE butt welding
Bore crossing beneath a railway line Railway crossing